Project Details

Client: Supreme Steel
Location: Regina, Saskatchewan
Capex: $1.2 Billion CAD
Project duration: 2015-2019
Owner: Regina Bypass Design Builders
Design firm: Buckland & Taylor, McElhanney, Urban Systems, EXP, Clifton Assoc, and Delcan
Architect: N/A
Engineer: Parsons
Contractor: Vinci, Carmacks, Graham, and Parsons

Scope of Work

  • Modeling and shop detailing of approximately 456 tons of structural steel for both Bridge 17 and 18 of the Regina Bypass project which included plate girders, cross frames and horizontal bracing

Project Stats

  • The largest infrastructure project in the province of Saskatchewan’s history and will improve a key component of the National Highway system
  • Includes 12 overpasses (33 total bridges), 40 kilometres of new four-lane highway, and 20 kilometres of resurfaced four-lane highway, 55 kilometres of new service roads and twinning of about 5 kilometres of Highway 6
  • Built to service between 11,500 to 25,000 vehicles per day

dashed-icon

Highlights & Challenges

  • The project was completed on an aggressive design and construction schedule. The design-build contract was awarded in December 2012 and the fast-paced design commenced in January 2013. The bridge opened for traffic in December 2015, 4 months ahead of schedule.

dashed-icon

Related Projects