Innovative planning for the most efficiency in your project

PreConstruction modeling allows you and your team to visualize your design concept, opening the door for better communication before you hit the ground running.
dashed-icon

We recommend projects utilize PreConstruction modeling early on. It allows designers to call on us for advice in development including erection schemes, value engineering and constructability or erectability issues. With our vast experience and knowledge in the bridge industry and 3D bridge modeling we can analyze any problem areas and provide options and solutions.

The virtual trial fit-up/erection helps your design team and steel fabricator work together more efficiently. The pre-con model allows both teams to view complex details allowing them to check for accessibility of the welding or bolting parts of design development prior to fabrication.

Benefits for you and your project

Reduce Lead Times

Reduce Lead Times

Get preliminary information and reports regarding Advanced Bill of Materials for early procurement of steel to reduce long lead times, especially for critical high-performance steel items.

Reduce Costs

Reduce Costs

Reduced costs through early involvement in the design and refinement of the bridge structural steel components and connection details. Potential future issues that may come from using a traditional type bid/build process can be eliminated.

Maximize Efficiencies

Maximize Efficiencies

Maximize efficiencies throughout the construction process and minimize the need for clarification or change to reduce or eliminate the need for RFI’s (Request for Information).

Review Design

Review Design

Ensure the review of the design details follow the appropriate Federal or State requirements.