Design Made Visual

Our 3D bridge modeling technology combines detail with innovation to bring your concepts to life and strengthen efficiency from end to end.
dashed-icon

As one of the first adopters of Tekla 3D modeling software Candraft is changing the future of bridge building. With greater precision and an experienced team of bridge and building draftsmen, we have successfully completed over 225 bridge projects since 1979.

3D Bridge Modeling
BrIM Management
Pre-Construction Modeling

Simulate a project’s erection and construction with real-time animation to identify key concerns and eliminate costly fixes and schedule delays.

cable-stayed_the-abraham-lincoln-bridge
Cable-Stayed Bridges
suspensions-bridges-new-san-francisco-oakland-bridge
Suspension Bridges
moveable-bridges-unionport-600×600-wht
Moveable Bridges
truss-bridges-huey-long-bridge
Truss Bridges
arch-bridges-portageville-arch-railway-bridge
Arch & Tied Arch Bridges
pedestrian-bridges-rhode-island-600×600-wht
Pedestrian Bridges
beam-bridges-regina-bypass-project
Beam Bridges
  • "It is impossible to imagine the Peace Bridge Rehabilitation project going as well without Candraft’s direct involvement. Their ability to easily manage the complexities associated with retrofitting a historic 90-year-old bridge greatly exceeded my expectations. Throughout the entire detailing process, I was continuously astonished by their modeling capabilities and attention to detail. It was truly a pleasure working with them and look forward to future projects."

    Timothy Coyle PE / Parsons
  • "Candraft provided modeling and detailing services for the steel bridge structures of the Regina Bypass Project. Candraft was thoroughly engaged throughout the detailing process to expedite approvals while providing clear and concise drawing packages that were tailored to each fabrication shop. These drawings packages translated into a seamless erection phase and the Candraft team was always available to provide immediate support where required. Supreme continues to work with Candraft and looks forward to further collaborate with the team on future opportunities."

    Nick Zubick, E.I.T Project Manager / Supreme Group
  • “Veritas has worked with Candraft on multiple projects. Most recently, Candraft was our detailer of choice on the Maitland Pedestrian Arch in Florida. They had the capacity to manage the project schedule needed to keep the fabrication processes efficient. Their efforts in 3D coordination and engineering expertise were unmatched on this project. They were a driving force for identifying and resolving design concerns and trade coordination issues with the team long before reaching the fabrication stages of the project saving potential hours of rework in the shop and field.”

    Jeremy Duckett Project Manager Veritas Steel
  • "The original Providence Pedestrian Bridge design plans lacked the coordination and detail of the steel and architectural elements required to begin steel fabrication drawings causing potential extensive delays. Once Candraft stepped into the design-assist role, the steel design timeframe was reduced significantly. Candraft’s ability to provide a more constructible design resulted in a faster fabrication and installation of the steel structure than anticipated."  

    Matt Giovino Project Manager / Daniel O’Connell’s Sons
our-capabilities